Diridon Station, Delmas Avenue20200507165437
A ten floor residential tower over a lobby and retail space and a three level parking structure; 325...
Solstice Apartment Homes20200507192144
Hohbach-Lewin structurally designed the two 4-story buildings comprising 280 units in wood framed co...
Bay 101 Embassy Suites Hotel20200507192303
An eight story 190,000 SF 194 Unit hotel...
Mission Hills Square20200507193540
Four and five story residential towers over one level of above grade parking; 158 Units encompassing...
Data Centers20200507193805
Hohbach-Lewin, Inc. has provided civil and structural engineering design services for several Silico...
San Mateo County Hospital20200507193844
Hohbach-Lewin principal, Dan Lewin, S.E. was the structural engineer of record for this new $200M re...
Slocum Center for Orthopedic and Sports Medicine20200507194934
Construction of the building is composed of concrete fill over metal deck, supported on steel wide f...
Stanford Hospital20200507195254
Hohbach-Lewin has completed multiple projects at the Stanford University Medical Center, many involv...
UC Davis Medical Center Tower20200507195333
Faced with a combination of recalcitrant sub-contractors and a rapidly shrinking construction schedu...
Villa Siena Skilled Nursing Facility20200507195405
The expansion includes a new 65,000 SF two-story, wood framed assisted Living Center, a 20,000 SF 30...
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521
Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Fund...
Oregon Coast Community College20200507195609
The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
Santa Clara University – College of Arts, Sciences and Communication20200507195657
A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Stanford Institute for Economic Policy Research20200507195827
Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynth...
Extended Stay Hotels20200507195926
Hohbach-Lewin, Inc. provided structural design for this national hotel chain’s site adapted pro-typi...
Inn at 5th20200507200009
This new 5-story structure is Eugene’s first downtown hotel to be constructed in 28 years. Hohbach-l...
Pillar Point Harbor Village20200507200037
Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-s...
Rainforest Café20200507200110
Hohbach-Lewin provided structural engineering design for Rainforest Café’s flagship restaurant. This...
Silver Oak Cellars20200507200156
Hohbach-Lewin provided structural engineering services for the new Hospitality, Administration, and ...
The Harvest Inn20200507200223
The Harvest Inn, a collection of charming brick and wood lodgings, is a Napa Valley retreat located ...
Abraham Lincoln High School20200507200308
The project included a new $15M, two-story steel moment resisting frame building which replaces 26 t...
Berryessa Youth Center20200507200340
This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity room...
Capuchino High School20200507200419
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administratio...
Fremont High School Modernization & Expansion20200507200501
In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin...
La Entrada MS Gymnasium20200507200536
This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses f...
Lincoln High School20200507200616
The modernization scope renovated the Theater Building, while the new construction included a new tw...
Sequoia High School Gymnasium20200507200707
The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achiev...
St. Francis Performing Arts Center20200507200744
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been des...
Creek Bridge Village20200507200904
This project includes Multi-story luxury apartments over Retail spaces....
Crescent Village Town Center East and West Villages20200507200931
The first and second floor levels are concrete post-tensioned slabs that support the 4-levels of woo...
Cummings Park Mixed-Use Complex20200507201009
This three-story multi-unit building consists of two levels of wood framing over retail and under gr...
Fourth & U20200507201310
Hohbach-Lewin, Inc. was called in to provide full structural design services for both the sub-grade ...
Jack London Gateway20200507201414
This 61 unit mixed-use development utilizes 3 levels of light gauge framing supported by a post-tens...
Opportunity Center of the MidPeninsula20200507201451
The mixed-use facility constructed by Not-for-Profit Housing developers encompasses 74,000 square fe...
Royal Mixed-Use Building20200507201540
The development provided an environmentally conscious solution to affordable housing by locating the...
The Vineyards Apartments20200507201632
The total building area is 157,000 square feet and the construction cost was $24.0M....
Trellis Square Apartments20200507201655
This seven building apartment complex, originally constructed in the early 80’s required extensive s...
401 Castro Street20200507201738
This new 30,000 square foot, three story office building includes two levels of subterranean parking...
Abgenix20200507201830
Hohbach-Lewin, Inc. provided full structural engineering design services for the build-out of this $...
Citrix20200507201902
Hohbach-Lewin, Inc. provided structural design services for the build-out of this 50,000 square foot...
Crossing/90020200507201932
Hohbach-Lewin, Inc., while working with the steel fabricator for the project, assisted in the comple...
Cupertino Town Center20200507201958
Hohbach-Lewin provided structural engineering design services for the entire project which also incl...
NeoCenter Medical Office Building20200507202055
This new 35,000 square foot, three story medical office building includes a level of subterranean pa...
AutoNation’s Smyth European Mercedes Parking Garage20200507202205
This three-story 73,000 sq ft parking garage was built to house onsite automobile storage for the de...
BMW of Mountain View20200507202212
This new three-story 120,000 square foot parking garage will house onsite automobile storage for the...
City Toyota Car Dealership20200507202245
This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 squar...
Lexus Serramonte20200507202301
Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and ...
UCLA Harbor Medical Center Parking Garage20200507202320
Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage...
Charleston Plaza20200507202412
This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & B...
Nut Tree Retail Center20200507202448
This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tr...
Pacific Commons Regional Retail Center20200507202504
Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center...
The Plant20200507202521
This new 600,000 square foot 26 building complex in San Jose includes a new Target and Home Depot. W...
Vons20200507202549
Hohbach-Lewin provided structural design services for this new Von’s store in Long Beach, CA. In add...
Stanford University, Crothers Memorial Hall20200507202615
By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminate...
Historic Hoover Middle School20200507202700
This 1930’s vintage concrete building has been retrofitted and returned to public educational use ut...
Marin Executive Center20200507202728
The retrofit solution largely consisted of the construction of exterior buttresses which served the ...
Santa Ana State Office Building20200507202754
Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete ...
Stent Hall, Menlo School20200507202808
This existing 3-story historic concrete mansion now functions as the administration building for Men...
Glendale City Center20200507202827
A dynamic analysis was performed on this structure in order to accurately model the structure’s expe...
Phelan Building20200507202850
Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Fran...
Los Altos Hills Residence 120200507202910
This elaborate 18,000 square foot residence has Italianate detailing on the front facade and traditi...
Los Altos Hills Residence 220200507202936
This new 6000 square foot, custom home includes a 600 square foot guest cottage perched over a rock-...
Los Altos Residence20200507202950
This Asian influenced home includes 5000 sf with a partial basement. Special steel frames were desig...
Peninsula Residence20200507203003
This peninsula residence is designed to reflect its natural surroundings. An organic effect is creat...
San Jose Residence20200507203018
Hohbach-Lewin provided both civil and structural engineering design and construction support service...
Saratoga Residence20200507203049
This custom house on a five-acre lot above downtown Saratoga includes a 14,000 square-foot partially...
Mabel Mattos Elementary20200507203146
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvemen...
Sequoia High School Tea Garden20200507203209
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, port...
McCandless Roadway Improvements20200507203253
McCandless Roadway improvements included new alignment of the roadway to accommodate a new right tur...
Cinnamon Court20200507203357
Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” wa...
Kaspick Wine Cellar20200507203428
For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with ...
College of Canyons Science Building20200507203442
The project consists of a new science and lecture building, four stories high and approximately 47,0...
Mission Community College Health and Wellness Center20200507203506
The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specializ...
Santa Barbara Community College20200507203541
The structural framing system consists of concrete filled metal decking supported by a structural st...
UO Tykeson Hall20200507203556
Tykeson Hall will house academic and career advising, student resources for the College of Arts and ...
Stanford Roble Gymnasium20200507203612
Structural challenges included qualifying and improving the existing arcades and strengthening the e...
Riviera20200507203628
Hohbach-Lewin, Inc. provided full structural engineering services for the Riviera Residential Buildi...
Park Plaza20200507203656
Project comprises 82 residential rental units in 105,000 square feet on the 2nd and 3rd floors of a ...
Eugene Airport20200507203712
The renovation project, completed in February 2017, was focused on easing congestion and improving f...
Capital Milling20200507203738
The Capitol Milling complex began as a flour mill and the first installation may have been the very ...
Pioneer Bookstore, CSU East Bay20200508180745
The building is sited over an existing loading dock between the student union and library. The desig...
Trace Elementary School20200508202655
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building...
Safeway Expansion and Renovation20200508202851
The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this ...
EWEB Roosevelt Operations Center20200509181125
Hohbach-Lewin is providing Structural Design and Construction Support Services for the Eugene Water ...
Monterey Peninsula College Bridge20200609162250
When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of th...
Railbrazer Roller Coaster20200609163055
Besides designing buildings, we also get to design cool things like the Railbrazer Coaster at Great ...
UCSF Third St. Parking Garage Façade20200609163658
Located in the heart of the thriving Mission Bay neighborhood of San Francisco across the street fro...
Magdalena Road Residence20200609164159
This new 6500 square foot residence designed by Peterson Architects of Palo Alto is being constructe...
Howard Elementary School20200609170856
Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on...
Harker School20200609171125
The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San...
Menlo Atherton High School20200609171604
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The ...
Presqu’ile Winery20200609171919
This three-story masonry & steel winery hospitality building, associated production buildings and wi...
Glaze Meadows20200609172153
Framing for the Natatorium and Fitness Center includes exposed long span glulam beams and columns. E...
Epiphany Hotel20200609172351
The building features an iconic, six-story tile mosaic called El Palo Alto, the tall redwood tree af...
Lane Community College20200609174059
The LEED Platinum certified building for Santa Barbara Community College houses classrooms, labs, of...
Milpitas Sport Center Pool Improvements20200609180851
We designed a drainage system which was invisible, it actually just looks like an expansion joint in...
Bramhall Park20200609181517
Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restro...
Pilarcitos Continuation School20200609182130
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common o...
Hatch Elementary School20200609183142
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classr...
Cunha Middle School20200609183459
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent ten...
Brokaw Plaza Shopping Center20200609183805
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with t...
Brokaw and Bering20201007193503
Consisting of (3) office buildings along the Highway 101 corridor, these structures provide much nee...
Chappo Dining Facility Parking Structure20201007194112
The project consisted of construction of a three-level parking structure, 180 Stalls for the 33,000 ...
Cupertino Town Center Parking Structure20201007194348
Located at 19500 Vallco Parkway, this seven level parking structure, five stories above grade and tw...
Mosaic Parking Structure20201007194754
The multi-storied structure, located on North First Street adds a total of 307 new parking spaces ov...
Peter Pan BMW Service Center20201007195743
The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-...
Stevens Creek Volkswagon20201007200047
In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met ...
CityLine Sunnyvale AMC and Whole Foods20201007200728
Included in this multiuse 36 acre development is a new two story retail facility and associated reno...
Station 1300 Shoring20201007201747
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabiliz...
Altmeyer Social Security Administration Building20201016153032
Seismic, blast, progressive collapse, and vehicle ramming hazards were mitigated for a total buildin...
Project Black Hat – Camp Humphreys20201016153936
Anti-Terrorism and Force Protection (AT/FP) design of a new 100,000-sf classified operations facilit...
Combined Test Force Compound – Edwards Air Force Base20201016154342
Anti-Terrorism and Force Protection (AT/FP) technical design efforts of approximately 275,000-sf of ...
Newark Liberty International Airport Terminal A Redevelopment20201016154820
The new facility was designed to mitigate against a host of terrorist attacks, including high-explos...
Purple Line Subway Extension Phase 0320201016155113
A blast evaluation and design effort was provided for buried mission critical utilities and associat...
Ronald V. Dellums Federal Building and U.S. Courthouse20201016155616
The 1,020,000 square feet facility was evaluated against critical terrorist threats relative to Inte...
U.S. Embassy Rome Compound20201016155952
The U.S. Department of State required security and blast performance expertise to facilitate high-le...
Expanded Optometry Clinic – St. Cloud VA Health Care System20201016160410
The St. Cloud VA Health Care System’s optometry services capacity was increased through expansion of...
West Block Rehabilitation Project20201016160731
The West Block facility contains the House of Commons chambers and legislative offices and required ...
Montrose West and East Apartments20201106185544
Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were anoth...
Spenger’s and 4th Street Retail20201119162019
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called w...
Peabody Stadium20201119174616
Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin prov...