Sequoia High School Building A and Parking Lot
Redwood City, California
Hohbach-Lewin teamed up with Spencer Associates Architecture to provide civil and structural engineering design on a new science classroom wing, portable classrooms, new parking lot and storm drain utility infrastructure upgrade. To alleviate previous recurring localized flooding problems within the site, Hohbach-Lewin implemented upgrades to the existing storm drain system including a large duplex pump system and an underground storm water retention system capable of storing the equivalent of a 100-year storm draining to the catchment area.
The project was constructed by Sausal Corporation.
- All
- Academic
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521
CSU East Bay, Pioneer Heights Student Housing, Phases II & III
Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Oregon Coast Community College20200507195609
Oregon Coast Community College
The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
Santa Clara University – College of Arts, Sciences and Communication20200507195657
Santa Clara University – College of Arts, Sciences and Communication
A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Stanford Institute for Economic Policy Research20200507195827
Stanford Institute for Economic Policy Research
Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Abraham Lincoln High School20200507200308
Abraham Lincoln High School
The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Berryessa Youth Center20200507200340
Berryessa Youth Center
This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Capuchino High School20200507200419
Capuchino High School
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Fremont High School Modernization & Expansion20200507200501
Fremont High School Modernization & Expansion
In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
La Entrada MS Gymnasium20200507200536
La Entrada MS Gymnasium
This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Lincoln High School20200507200616
Lincoln High School
The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
Sequoia High School Gymnasium20200507200707
Sequoia High School Gymnasium
The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
St. Francis Performing Arts Center20200507200744
St. Francis Performing Arts Center
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
UCLA Harbor Medical Center Parking Garage20200507202320
UCLA Harbor Medical Center Parking Garage
Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Historic Hoover Middle School20200507202700
Historic Hoover Middle School
This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Mabel Mattos Elementary20200507203146
Mabel Mattos Elementary
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209
Sequoia High School Tea Garden
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
McCandless Roadway Improvements20200507203253
McCandless Roadway Improvements
McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357
Cinnamon Court
Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428
Kaspick Wine Cellar
For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
College of Canyons Science Building20200507203442
College of Canyons Science Building
The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Mission Community College Health and Wellness Center20200507203506
Mission Community College Health and Wellness Center
The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
Santa Barbara Community College20200507203541
Santa Barbara Community College
The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
UO Tykeson Hall20200507203556
UO Tykeson Hall
Tykeson Hall will house academic and career advising, student resources for the College of Arts and Sciences as well as provi...
Stanford Roble Gymnasium20200507203612
Stanford Roble Gymnasium
Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
Pioneer Bookstore, CSU East Bay20200508180745
Pioneer Bookstore, CSU East Bay
The building is sited over an existing loading dock between the student union and library. The design features a full height ...
Trace Elementary School20200508202655
Trace Elementary School
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Monterey Peninsula College Bridge20200609162250
Monterey Peninsula College Bridge
When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Howard Elementary School20200609170856
Howard Elementary School
Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Harker School20200609171125
Harker School
The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San Jose opened to great fan...
Menlo Atherton High School20200609171604
Menlo Atherton High School
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Lane Community College20200609174059
Lane Community College
An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for ...
Milpitas Sport Center Pool Improvements20200609180851
Milpitas Sport Center Pool Improvements
We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517
Bramhall Park
Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130
Pilarcitos Continuation School
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142
Hatch Elementary School
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459
Cunha Middle School
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805
Brokaw Plaza Shopping Center
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Montrose West and East Apartments20201106185544
Montrose West and East Apartments
Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019
Spenger’s and 4th Street Retail
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
Peabody Stadium20201119174616
Peabody Stadium
Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
441 Page Mill20210817162129
441 Page Mill
This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
Hyundai of Elk Grove20200507191519
Hyundai of Elk Grove
Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to pr...
Oak Grove Elementary School20230623162304
Oak Grove Elementary School
Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
Load more