St. Francis Performing Arts Center20200507200744
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Mabel Mattos Elementary20200507203146
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
McCandless Roadway Improvements20200507203253
McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357
Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428
For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
Monterey Peninsula College Bridge20200609162250
When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
UCSF Third St. Parking Garage Façade20200609163658
Located in the heart of the thriving Mission Bay neighborhood of San Francisco across the street from the new Chase Center, t...
Menlo Atherton High School20200609171604
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Milpitas Sport Center Pool Improvements20200609180851
We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517
Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Station 1300 Shoring20201007201747
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Purple Line Subway Extension Phase 0320201016155113
A blast evaluation and design effort was provided for buried mission critical utilities and associated junction structures at...
Montrose West and East Apartments20201106185544
Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...