Abraham Lincoln High School20200507200308
The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Berryessa Youth Center20200507200340
This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Capuchino High School20200507200419
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Fremont High School Modernization & Expansion20200507200501
In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
La Entrada MS Gymnasium20200507200536
This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Lincoln High School20200507200616
The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
Sequoia High School Gymnasium20200507200707
The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
St. Francis Performing Arts Center20200507200744
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Historic Hoover Middle School20200507202700
This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Mabel Mattos Elementary20200507203146
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
McCandless Roadway Improvements20200507203253
McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357
Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428
For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
Trace Elementary School20200508202655
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Howard Elementary School20200609170856
Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Menlo Atherton High School20200609171604
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Milpitas Sport Center Pool Improvements20200609180851
We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517
Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Montrose West and East Apartments20201106185544
Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
Peabody Stadium20201119174616
Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
441 Page Mill20210817162129
This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
Hyundai of Elk Grove20200507191519
Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to pr...
Oak Grove Elementary School20230623162304
Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...