Diridon Station, Delmas Avenue20200507165437
A ten floor residential tower over a lobby and retail space and a three level parking structure; 325 Units 393,000SF...
Solstice Apartment Homes20200507192144
Hohbach-Lewin structurally designed the two 4-story buildings comprising 280 units in wood framed construction, supported by ...
Mission Hills Square20200507193540
Four and five story residential towers over one level of above grade parking; 158 Units encompassing 240,000 SF....
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521
Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Inn at 5th20200507200009
This new 5-story structure is Eugene’s first downtown hotel to be constructed in 28 years. Hohbach-lewin is particularly plea...
Pillar Point Harbor Village20200507200037
Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-story Oceano Hotel Buildin...
Creek Bridge Village20200507200904
This project includes Multi-story luxury apartments over Retail spaces....
Cummings Park Mixed-Use Complex20200507201009
This three-story multi-unit building consists of two levels of wood framing over retail and under ground parking....
Fourth & U20200507201310
Hohbach-Lewin, Inc. was called in to provide full structural design services for both the sub-grade parking and the five stor...
Jack London Gateway20200507201414
This 61 unit mixed-use development utilizes 3 levels of light gauge framing supported by a post-tensioned concrete podium....
Opportunity Center of the MidPeninsula20200507201451
The mixed-use facility constructed by Not-for-Profit Housing developers encompasses 74,000 square feet of Single Residential ...
Royal Mixed-Use Building20200507201540
The development provided an environmentally conscious solution to affordable housing by locating the Royal Building in the he...
The Vineyards Apartments20200507201632
The total building area is 157,000 square feet and the construction cost was $24.0M....
Trellis Square Apartments20200507201655
This seven building apartment complex, originally constructed in the early 80’s required extensive structural renovation due ...
BMW of Mountain View20200507202212
This new three-story 120,000 square foot parking garage will house onsite automobile storage for the dealership. The structur...
City Toyota Car Dealership20200507202245
This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 square foot parking structure ...
Lexus Serramonte20200507202301
Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and Avanessian Associates to ...
Charleston Plaza20200507202412
This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenant...
Nut Tree Retail Center20200507202448
This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously s...
Pacific Commons Regional Retail Center20200507202504
Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months fr...
The Plant20200507202521
This new 600,000 square foot 26 building complex in San Jose includes a new Target and Home Depot. Working closely with the d...
Vons20200507202549
Hohbach-Lewin provided structural design services for this new Von’s store in Long Beach, CA. In addition to this store, Hohb...
Riviera20200507203628
Hohbach-Lewin, Inc. provided full structural engineering services for the Riviera Residential Building Development near Walnu...
Park Plaza20200507203656
Project comprises 82 residential rental units in 105,000 square feet on the 2nd and 3rd floors of a new 3-story mixed use bui...
Safeway Expansion and Renovation20200508202851
The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
Brokaw Plaza Shopping Center20200609183805
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Peter Pan BMW Service Center20201007195743
The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-in drop off area....
Stevens Creek Volkswagon20201007200047
In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met the owner’s aggressive co...
CityLine Sunnyvale AMC and Whole Foods20201007200728
Included in this multiuse 36 acre development is a new two story retail facility and associated renovated parking structure w...
Station 1300 Shoring20201007201747
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Montrose West and East Apartments20201106185544
Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...