441 Page Mill

441 Page Mill

Palo Alto, California

This eye catching, mixed-use, 3-story building near the  busy Palo Alto intersection of Page Mill Rd and El Camino Real was yet another integrated design project in which Hohbach-Lewin’s structural and civil engineering staff, together teamed up with Stoecker and Northway Architects to make this project a reality.  The structure is light gauge steel for the upper story housing over structural steel framing for the office, retail and parking functions.  C.3 storm water treatment requirements were met by utilizing a flow-through planter located in the rear of the project site to maximize usable space. Construction was completed in 2021 by South Bay Construction.

Pillar Point Harbor Village20200507200037

Pillar Point Harbor Village

Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-story Oceano Hotel Buildin...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Creek Bridge Village20200507200904

Creek Bridge Village

This project includes Multi-story luxury apartments over Retail spaces....
Crescent Village Town Center East and West Villages20200507200931

Crescent Village Town Center East and West Villages

The first and second floor levels are concrete post-tensioned slabs that support the 4-levels of wood framed housing above....
BMW of Mountain View20200507202212

BMW of Mountain View

This new three-story 120,000 square foot parking garage will house onsite automobile storage for the dealership. The structur...
City Toyota Car Dealership20200507202245

City Toyota Car Dealership

This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 square foot parking structure ...
Lexus Serramonte20200507202301

Lexus Serramonte

Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and Avanessian Associates to ...
Charleston Plaza20200507202412

Charleston Plaza

This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenant...
Nut Tree Retail Center20200507202448

Nut Tree Retail Center

This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously s...
Pacific Commons Regional Retail Center20200507202504

Pacific Commons Regional Retail Center

Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months fr...
The Plant20200507202521

The Plant

This new 600,000 square foot 26 building complex in San Jose includes a new Target and Home Depot. Working closely with the d...
Vons20200507202549

Vons

Hohbach-Lewin provided structural design services for this new Von’s store in Long Beach, CA. In addition to this store, Hohb...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
McCandless Roadway Improvements20200507203253

McCandless Roadway Improvements

McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357

Cinnamon Court

Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428

Kaspick Wine Cellar

For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
Safeway Expansion and Renovation20200508202851

Safeway Expansion and Renovation

The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Milpitas Sport Center Pool Improvements20200609180851

Milpitas Sport Center Pool Improvements

We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517

Bramhall Park

Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805

Brokaw Plaza Shopping Center

The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Peter Pan BMW Service Center20201007195743

Peter Pan BMW Service Center

The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-in drop off area....
Stevens Creek Volkswagon20201007200047

Stevens Creek Volkswagon

In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met the owner’s aggressive co...
CityLine Sunnyvale AMC and Whole Foods20201007200728

CityLine Sunnyvale AMC and Whole Foods

Included in this multiuse 36 acre development is a new two story retail facility and associated renovated parking structure w...
Station 1300 Shoring20201007201747

Station 1300 Shoring

To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Montrose West and East Apartments20201106185544

Montrose West and East Apartments

Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019

Spenger’s and 4th Street Retail

Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
Hyundai of Elk Grove20200507191519

Hyundai of Elk Grove

Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to pr...
Load more