Oak Grove Elementary School

Oak Grove Elementary School

Eugene, Oregon

Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for the Greater Albany Public School District completed in 2019. Located just outside Albany, Oregon this 65,000sf L-Shaped building is placed on an 8 acre site surrounded by picturesque farmland.
The wood framed two-story classroom wing includes manufactured wood trusses and offers a welcoming environment for both kids and teachers alike. Notable features include a spacious cafeteria and gymnasium both designed with metal roof framing spanning between open-web steel joists and concrete tilt-up panels. Additional features include a media center and covered outdoor play area.

Architect: Glas Architects
Contractor: Gerding Builders
Construction Cost: $26 million
Construction Completed: 2019

El Rodeo Elementary School20241009181427

El Rodeo Elementary School

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
Peabody Stadium20201119174616

Peabody Stadium

Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Lane Community College20200609174059

Lane Community College

An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for ...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Monterey Peninsula College Bridge20200609162250

Monterey Peninsula College Bridge

When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Trace Elementary School20200508202655

Trace Elementary School

Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Pioneer Bookstore, CSU East Bay20200508180745

Pioneer Bookstore, CSU East Bay

The building is sited over an existing loading dock between the student union and library. The design features a full height ...
Stanford Roble Gymnasium20200507203612

Stanford Roble Gymnasium

Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
UO Tykeson Hall20200507203556

UO Tykeson Hall

Tykeson Hall will house academic and career advising, student resources for the College of Arts and Sciences as well as provi...
Santa Barbara Community College20200507203541

Santa Barbara Community College

The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
Mission Community College Health and Wellness Center20200507203506

Mission Community College Health and Wellness Center

The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
College of Canyons Science Building20200507203442

College of Canyons Science Building

The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
UCLA Harbor Medical Center Parking Garage20200507202320

UCLA Harbor Medical Center Parking Garage

Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Sequoia High School Gymnasium20200507200707

Sequoia High School Gymnasium

The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
Lincoln High School20200507200616

Lincoln High School

The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
La Entrada MS Gymnasium20200507200536

La Entrada MS Gymnasium

This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Fremont High School Modernization & Expansion20200507200501

Fremont High School Modernization & Expansion

In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Berryessa Youth Center20200507200340

Berryessa Youth Center

This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Abraham Lincoln High School20200507200308

Abraham Lincoln High School

The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Stanford Institute for Economic Policy Research20200507195827

Stanford Institute for Economic Policy Research

Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Santa Clara University – College of Arts, Sciences and Communication20200507195657

Santa Clara University – College of Arts, Sciences and Communication

A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Oregon Coast Community College20200507195609

Oregon Coast Community College

The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521

CSU East Bay, Pioneer Heights Student Housing, Phases II & III

Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Load more