Lane Community College

Lane Community College

Eugene, Oregon

Architects: Pivot Architecture & Perkins+Will
Contractor: Lease Crutcher Lewis
Construction Completed: 2016
Construction Cost: $35 million

An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for Learning and Student Success (CLASS). The new CLASS building is the true heart of the LCC campus, offering bright open spaces that house numerous academic resources as well as being a place where students congregate, study and socialize. Originally constructed in the 1960’s, this 4-story concrete building features massive precast concrete beams and columns and exterior terraces which are visible throughout, offering a unique structural aesthetic to the space.
As part of the overall renovation project, Hohbach-Lewin provided an ASCE 41 seismic evaluation and upgrade which needed to incorporate the renovation’s major building plan revisions.
The project also included a seismically separated new steel frame addition for the Titan Bookstore. The LEED Silver certified transformation of the Center building has created a place on campus that will benefit students and staff for generations to come.

Berryessa Youth Center20200507200340

Berryessa Youth Center

This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
EWEB Roosevelt Operations Center20200509181125

EWEB Roosevelt Operations Center

Hohbach-Lewin is providing Structural Design and Construction Support Services for the Eugene Water and Electric Board’s new ...
Fremont High School Modernization & Expansion20200507200501

Fremont High School Modernization & Expansion

In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
Santa Barbara Community College20200507203541

Santa Barbara Community College

The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
Stanford Roble Gymnasium20200507203612

Stanford Roble Gymnasium

Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Oak Grove Elementary School20230623162304

Oak Grove Elementary School

Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
Slocum Center for Orthopedic and Sports Medicine20200507194934

Slocum Center for Orthopedic and Sports Medicine

Construction of the building is composed of concrete fill over metal deck, supported on steel wide flange beams, girders and ...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Oregon Coast Community College20200507195609

Oregon Coast Community College

The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
Peabody Stadium20201119174616

Peabody Stadium

Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
Rancho Milpitas Middle School20251130150117

Rancho Milpitas Middle School

Milpitas USD - Rancho Middle School site was able to convert a former play area at the school site to add a new track and fie...
Pioneer Bookstore, CSU East Bay20200508180745

Pioneer Bookstore, CSU East Bay

The building is sited over an existing loading dock between the student union and library. The design features a full height ...
McCandless Park20251126174100

McCandless Park

The Park Project was part of an overall project with Mabel Mattos Elementary School Site. Hohbach-Lewin handled the subdivisi...
Abraham Lincoln High School20200507200308

Abraham Lincoln High School

The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Mission Community College Health and Wellness Center20200507203506

Mission Community College Health and Wellness Center

The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
Del Oro High School20241101212636

Del Oro High School

Del Oro High School features a brand new campus in Bakersfield that contains an admin building, performing arts center, gym, ...
Stanford University, Crothers Memorial Hall20200507202615

Stanford University, Crothers Memorial Hall

By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminated the need for both of th...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
College of the Canyons20241101210821

College of the Canyons

Hohbach-Lewin provided structural engineering design for the Takeda Science and Lecture Building and the Student Services Bui...
Monterey Peninsula College Bridge20200609162250

Monterey Peninsula College Bridge

When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Santa Clara University – College of Arts, Sciences and Communication20200507195657

Santa Clara University – College of Arts, Sciences and Communication

A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
UO Tykeson Hall20200507203556

UO Tykeson Hall

Tykeson Hall will house academic and career advising, student resources for the College of Arts and Sciences as well as provi...
Thomas Russell Middle School20251130150320

Thomas Russell Middle School

Hohbach-Lewin worked with Milpitas USD to design and oversee the construction of a new track and field project at Thomas Russ...
Sequoia High School Gymnasium20200507200707

Sequoia High School Gymnasium

The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
College of Canyons Science Building20200507203442

College of Canyons Science Building

The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Trace Elementary School20200508202655

Trace Elementary School

Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
La Entrada MS Gymnasium20200507200536

La Entrada MS Gymnasium

This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Stanford Institute for Economic Policy Research20200507195827

Stanford Institute for Economic Policy Research

Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521

CSU East Bay, Pioneer Heights Student Housing, Phases II & III

Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
El Rodeo Elementary School20241009181427

El Rodeo Elementary School

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
UCLA Harbor Medical Center Parking Garage20200507202320

UCLA Harbor Medical Center Parking Garage

Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Lincoln High School20200507200616

Lincoln High School

The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
Load more