Pillar Point Harbor Village20200507200037
Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-story Oceano Hotel Buildin...
Creek Bridge Village20200507200904
This project includes Multi-story luxury apartments over Retail spaces....
Crescent Village Town Center East and West Villages20200507200931
The first and second floor levels are concrete post-tensioned slabs that support the 4-levels of wood framed housing above....
BMW of Mountain View20200507202212
This new three-story 120,000 square foot parking garage will house onsite automobile storage for the dealership. The structur...
City Toyota Car Dealership20200507202245
This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 square foot parking structure ...
Lexus Serramonte20200507202301
Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and Avanessian Associates to ...
Charleston Plaza20200507202412
This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenant...
Nut Tree Retail Center20200507202448
This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously s...
Pacific Commons Regional Retail Center20200507202504
Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months fr...
The Plant20200507202521
This new 600,000 square foot 26 building complex in San Jose includes a new Target and Home Depot. Working closely with the d...
Vons20200507202549
Hohbach-Lewin provided structural design services for this new Von’s store in Long Beach, CA. In addition to this store, Hohb...
Safeway Expansion and Renovation20200508202851
The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
Brokaw Plaza Shopping Center20200609183805
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Peter Pan BMW Service Center20201007195743
The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-in drop off area....
Stevens Creek Volkswagon20201007200047
In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met the owner’s aggressive co...
Station 1300 Shoring20201007201747
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Spenger’s and 4th Street Retail20201119162019
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...