Eugene Airport

Eugene Airport

Eugene, Oregon

Hohbach-Lewin provided Structural Design and Construction Support Services for the City of Eugene’s Airport Expansion Project. The renovation project, completed in February 2017, was focused on easing congestion and improving functionality for passengers. The $17M construction budget included 19,350 square feet of renovated space and an additional 12,800 square feet of new construction, several areas including the security screening checkpoint, B-gate hold room, A-gate concourse and baggage claim area.

The renowned airport architectural firm of RS&H Architects provided architectural, mechanical, electrical and plumbing design but teamed with local expertise for their structural engineering, Hohbach-Lewin, and civil engineering, the BHE Group. Modeling the airport expansion in REVIT allowed for a higher level of coordination between the architectural, mechanical and structural systems as well as assisting our ability to match existing conditions such as the doubly curved glulam beams. Essex Construction acted as the General Contractor.

Officially 75 years old, the Eugene Airport had not had a substantial remodel since the late 80’s.
The airport is now a hub for six major airlines and offers ten non-stop destinations along with one-stop connections to nearly anywhere in the world. Completion of this latest expansion provides the perfect no-hassle and affordable option to hop on a plane and join us at the Eugene Office of Hohbach-Lewin.

Berryessa Youth Center20200507200340

Berryessa Youth Center

This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
McCandless Roadway Improvements20200507203253

McCandless Roadway Improvements

McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357

Cinnamon Court

Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428

Kaspick Wine Cellar

For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
EWEB Roosevelt Operations Center20200509181125

EWEB Roosevelt Operations Center

Hohbach-Lewin is providing Structural Design and Construction Support Services for the Eugene Water and Electric Board’s new ...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Milpitas Sport Center Pool Improvements20200609180851

Milpitas Sport Center Pool Improvements

We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517

Bramhall Park

Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805

Brokaw Plaza Shopping Center

The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Station 1300 Shoring20201007201747

Station 1300 Shoring

To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Altmeyer Social Security Administration Building20201016153032

Altmeyer Social Security Administration Building

Seismic, blast, progressive collapse, and vehicle ramming hazards were mitigated for a total building rehabilitation of the e...
Project Black Hat – Camp Humphreys20201016153936

Project Black Hat – Camp Humphreys

Anti-Terrorism and Force Protection (AT/FP) design of a new 100,000-sf classified operations facility project within U.S. Arm...
Combined Test Force Compound – Edwards Air Force Base20201016154342

Combined Test Force Compound – Edwards Air Force Base

Anti-Terrorism and Force Protection (AT/FP) technical design efforts of approximately 275,000-sf of existing multi-story hang...
Newark Liberty International Airport Terminal A Redevelopment20201016154820

Newark Liberty International Airport Terminal A Redevelopment

The new facility was designed to mitigate against a host of terrorist attacks, including high-explosive and vehicular ramming...
Purple Line Subway Extension Phase 0320201016155113

Purple Line Subway Extension Phase 03

A blast evaluation and design effort was provided for buried mission critical utilities and associated junction structures at...
Ronald V. Dellums Federal Building and U.S. Courthouse20201016155616

Ronald V. Dellums Federal Building and U.S. Courthouse

The 1,020,000 square feet facility was evaluated against critical terrorist threats relative to Interagency Security Committe...
U.S. Embassy Rome Compound20201016155952

U.S. Embassy Rome Compound

The U.S. Department of State required security and blast performance expertise to facilitate high-level planning as to existi...
Expanded Optometry Clinic – St. Cloud VA Health Care System20201016160410

Expanded Optometry Clinic – St. Cloud VA Health Care System

The St. Cloud VA Health Care System’s optometry services capacity was increased through expansion of the existing Building 29...
West Block Rehabilitation Project20201016160731

West Block Rehabilitation Project

The West Block facility contains the House of Commons chambers and legislative offices and required anti-terrorism design to ...
Load more