Contact Us

Retail Centers

Nut Tree Retail Center, Vacaville, CA

Nut Tree Retail Center, Vacaville, CAThis 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously stood. Building construction types consist of concrete tilt-up panels, steel moment frames and wood frames and wood framed shearwall structures. Due to the demanding schedule and scale of this project, Hohbach-Lewin worked closely with the owner, architect and general contractor from groundbreaking in September 2005 to ensure completion of the project by Fall of 2006.

Charleston Plaza, Mountain View, CA

Charleston Plaza, Mountain View, CAThis new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenants. Working closely with the architects and the owner/contractor, Hohbach-Lewin completed an efficient and cost effective design in three months. The Total construction coast was $30M.

Pacific Commons Regional Retail Center, Fremont, CA

Pacific Commons Regional Retail Center, Fremont, CAHohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months from preliminary concept to permit. Construction began in February so that the entire center could be open for business by Thanksgiving of 2005. Maintaining this compressed schedule required multiple phased packages and close co-ordination with the general contractor throughout the entire process. The construction cost was $65M.

Vons, Long Beach, CA

Hohbach-Lewin provided structural design services for this new Von’s store in Long Beach, CA. In addition to this store, Hohbach-Lewin also has provided design services to Safeway Corporation for new stores in Los Gatos, Burlingame, Milbrae, Pleasanton, West LA and Pasadena. Per Safeway requirements, construction documents for all new stores are being produced via 3D modeling software, REVIT.

Vons, Long Beach, CA

The Plant, San Jose, CA

This new 600,000 square foot 26 building complex in San Jose includes a new Target and Home Depot. Working closely with the developer, Westrust, and the general contractor, Turner Construction, Hohbach-Lewin completed a cost effective design in 6 months. The construction cost was $140M.

The Plant, San Jose, CA

© 2017 Hohbach-Lewin, Inc. All Rights Reserved.