Kaspick Wine Cellar20200507203428

Kaspick Wine Cellar

For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Structural and Civil Engineeri...
Cinnamon Court20200507203357

Cinnamon Court

Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main living space and long spans t...
McCandless Roadway Improvements20200507203253

McCandless Roadway Improvements

McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and Park parking lots, drop ...
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new parking lot and storm drain u...
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely with the City of Milpitas an...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lifts; also included in the p...
Hyundai of Elk Grove20200507191519

Hyundai of Elk Grove

Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to provide an integrated desig...